Hi,
I would like to restrict ICPR to launch a new job for each simulation point - I tried following this: https://support.cadence.com/apex/ArticleAttachmentPortal?id=a1Od0000000w6KOEAY&pageName=ArticleContent
However, this doesnt seem to work with ADE Assembler? Is there a way to do this?
I realize this will add overhead to my simulation run, however we are experiencing some undesired effects on our SGE when a single job is kept for days/weeks on ends, and would like experiment with this setup instead.
BR,
Christian
Version info:
Virtuoso 6.1.8-isr16