Hi,
I am using Virtuoso IC6.1.7-64b.500.13 and have my testbenches and tests in Maestro views.
I have a two run run plan:
Run.0: a calibration routine: Test = "calibrate_delay"
Output of interest: "cal_value_decimal"
Run.1: second calibration routine based on the result of the first test, passing it into a global variable using a calcval expression:
Global variables:
cal_stored = calcVal("cal_value_decimal" "calibrate_delay" ?run "Run.0")
The problem is that I can always see that both tests run concurrently and the correct value for cal_stored from Run.0 is not captured in Run.1
How can i best stage runs in my runplan?
Thanks in advance!
Craig
Image may be NSFW.Clik here to view.
