Quantcast
Viewing all articles
Browse latest Browse all 4906

Assembler Run Plan: enforcing runs to sequence correctly

Hi,

I am using Virtuoso IC6.1.7-64b.500.13 and have my testbenches and tests in Maestro views.

I have a two run run plan:

Run.0:  a calibration routine: Test = "calibrate_delay"

Output of interest: "cal_value_decimal"

Run.1: second calibration routine based on the result of the first test, passing it into a global variable using a calcval expression:

Global variables:

cal_stored = calcVal("cal_value_decimal" "calibrate_delay" ?run "Run.0")

The problem is that I can always see that both tests run concurrently and the correct value for cal_stored from Run.0 is not captured in Run.1

How can i best stage runs in my runplan?

Thanks in advance!

Craig

Image may be NSFW.
Clik here to view.

Viewing all articles
Browse latest Browse all 4906

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>