When I have a thousand corners for example and I set 10 spectre jobs to run in parallel the 10 runs are not maintained right to the end but reduce down to eventually 1 for the last 100 runs or so which considerably increase sim time. I am using ICRP, Optimise Single-Point Run, Local Distribution Method. IC6.1.8-64b.500.19
↧